Time, budget, and safety are almost always considered to be

1. Efficiency

2. Constraints

3. Trade-offs

4. Criteria

+5
Answers (2)
  1. 24 May, 14:09
    0
    The answer is option # 2. (Constraints).
  2. 24 May, 14:17
    0
    The answer is constraints