a plumber laying 500 meters of drain pipe required 20 men of working for 10 days. What length in meters would be laid by 50 men in 5 days, if they all work at the same rate?

+1
Answers (1)
  1. 19 August, 15:20
    0
    500 meters = 20men = 10days

    To get the factor 500 / (20*10) = 5/2 meters/day

    For 50 men and 5days we don't know the meters

    So we go by 50 * (5/2) * 5 = 625meters
Know the Answer?
Not Sure About the Answer?
Find an answer to your question 👍 “a plumber laying 500 meters of drain pipe required 20 men of working for 10 days. What length in meters would be laid by 50 men in 5 days, ...” in 📗 Mathematics if the answers seem to be not correct or there’s no answer. Try a smart search to find answers to similar questions.