JT Engineering has determined that it should cost $14,000 indirect materials, $12,600 indirect labor, and $6,200 in total overhead to produce 1,000 widgets. During the most recent period, JT actually spent $13,860 indirect materials, $12,420 indirect labor, and $6,500 in total overhead to produce 1,000 widgets. What is JT's total variance? Is it favorable or unfavorable?

+5
Answers (1)
  1. 14 June, 17:54
    0
    total variance: - $20 favorable

    Step-by-step explanation:

    The estimated cost is ...

    $14000 + 12600 + 6200 = $32800

    The actual cost is ...

    $13860 + 12420 + 6500 = $32780

    The variance is the difference between actual cost and predicted cost:

    $32,780 - 32800 = - $20.

    It is favorable when actual costs are lower than predicted.
Know the Answer?
Not Sure About the Answer?
Find an answer to your question 👍 “JT Engineering has determined that it should cost $14,000 indirect materials, $12,600 indirect labor, and $6,200 in total overhead to ...” in 📗 Mathematics if the answers seem to be not correct or there’s no answer. Try a smart search to find answers to similar questions.
Search for Other Answers