A railing needs to be build with 470.89 metric ton of iron the factory purchased only 0.38 part of required iron. How much iron is needed to complete the railing?
+1
Answers (2)
Know the Answer?
Not Sure About the Answer?
Find an answer to your question 👍 “A railing needs to be build with 470.89 metric ton of iron the factory purchased only 0.38 part of required iron. How much iron is needed ...” in 📗 Mathematics if the answers seem to be not correct or there’s no answer. Try a smart search to find answers to similar questions.
Home » Mathematics » A railing needs to be build with 470.89 metric ton of iron the factory purchased only 0.38 part of required iron. How much iron is needed to complete the railing?