A railing needs to be build with 470.89 metric ton of iron the factory purchased only 0.38 part of required iron. How much iron is needed to complete the railing?

+1
Answers (2)
  1. 14 July, 22:33
    0
    291.9518 T are required for completion

    Step-by-step explanation:

    The remaining 0.62 part is ...

    0.62 * 470.89 T = 291.9518 T
  2. 14 July, 22:38
    0
    291.9518 metric Ton

    Step-by-step explanation:

    Hello

    according to the data provided by the problem.

    Total Iron needed to build the railing (A) = 470.89 Ton

    Total Iron purchased by the factory = 0.38 of total

    Total Iron purchased by the factory = 0.38 * 470.89

    Total Iron purchased by the factory (B) = 178.9382metric Ton

    the difference between the total iron needed and the iron supplied by the factory will be the iron we need to get

    A-B=iron we need to get (c)

    C=A-B

    C=470.89-178.9382

    C=291.9518 metric Ton

    Have a great day.
Know the Answer?
Not Sure About the Answer?
Find an answer to your question 👍 “A railing needs to be build with 470.89 metric ton of iron the factory purchased only 0.38 part of required iron. How much iron is needed ...” in 📗 Mathematics if the answers seem to be not correct or there’s no answer. Try a smart search to find answers to similar questions.