Ask Question
27 November, 22:55

A cased and cemented hole with a measured depth of 7112 ft is perforated from 6967 ft to 6992 ft. the customer wants tubing to be at least 90 ft above the top of the perforations but wants the tubing to be at the rig floor located 18 ft above ground level. John is using 33 foot joints of tubing. how many joints should he use to satisfy the customers request?

+4
Answers (1)
  1. 27 November, 23:18
    0
    209 joints

    Step-by-step explanation:

    Depth of hole = 7112_ft

    Perforated depth = 6967_ft to 6992_ft

    Tubing set depth = 90_ft above top of perforation

    and 18_ft above ground

    Length of tubing required = (6967-90) + 18 = 6895_ft of tubing

    One joint of tubing = 33_ft

    6895_ft requires =

    6895_ft/33_ft = 208.93 ~~209 joints
Know the Answer?
Not Sure About the Answer?
Find an answer to your question 👍 “A cased and cemented hole with a measured depth of 7112 ft is perforated from 6967 ft to 6992 ft. the customer wants tubing to be at least ...” in 📗 Mathematics if the answers seem to be not correct or there’s no answer. Try a smart search to find answers to similar questions.