You still work at Dockery Manufacturing (still exciting!), and your organization still requires a lead time between 18 and 23 days for supplied items. After further investigating the supplier's process, you determine their current lead times are normally distributed with a process mean of 21 days and a standard deviation of 1.90. What is the percent likelihood that a randomly observed lead time by the supplier would be too short per your firm's specifications? Group of answer choices 5.71% 14.69% 20.58% 35.13% 44.29%

+5
Answers (1)
  1. 19 May, 17:56
    0
    The probability is of 14.69%

    Step-by-step explanation:

    According to the given data we have the following:

    Lead time mean = 21 days

    Standard deviation = 1.90

    To calculate the percent likelihood that a randomly observed lead time by the supplier would be too short per your firm's specifications we will calculate first the z statisticsas follows:

    z = (X - mean) / Standard deviation

    z = (23-21) / 1.90

    z = 1.05

    Then Looking at z table, we will find probability corresponding to z = 1.05. The probability is 0.8531 but the area for z > 1.05 will be 1 - 0.8531 = 0.1469

    Therefore, the probability is of 14.69%
Know the Answer?
Not Sure About the Answer?
Find an answer to your question 👍 “You still work at Dockery Manufacturing (still exciting!), and your organization still requires a lead time between 18 and 23 days for ...” in 📗 Mathematics if the answers seem to be not correct or there’s no answer. Try a smart search to find answers to similar questions.