Ask Question
28 March, 07:50

A construction engineer needs to make sure a ceiling beam is Parallel to its corresponding floor beam. Using the drawing as a guide, which part of the measurements are sufficient to show the beams are parallel

+1
Answers (1)
  1. 28 March, 08:19
    0
    Answer:221121
Know the Answer?
Not Sure About the Answer?
Find an answer to your question 👍 “A construction engineer needs to make sure a ceiling beam is Parallel to its corresponding floor beam. Using the drawing as a guide, which ...” in 📗 Mathematics if the answers seem to be not correct or there’s no answer. Try a smart search to find answers to similar questions.
Search for Other Answers