A cable is being replaced 15 meters beneath the surface of a body of water. The new cable must extend from a pole located 9 meters above the surface of the water. A contractor can bill $30 for each meter of cable replaced. What is the minimum cost of the replacement?

+3
Answers (1)
  1. 29 April, 16:51
    0
    Step-by-step explanation:

    Total cable length = 15m + 9m = 24m

    $30 per meter * 24m = $720
Know the Answer?
Not Sure About the Answer?
Find an answer to your question 👍 “A cable is being replaced 15 meters beneath the surface of a body of water. The new cable must extend from a pole located 9 meters above ...” in 📗 Mathematics if the answers seem to be not correct or there’s no answer. Try a smart search to find answers to similar questions.