Ask Question
3 November, 05:32

Which requires more work, lifting a 10.0kg load a vertical distance of 2m or lifting a 5.0kg load a distance of 4m?

+5
Answers (1)
  1. 3 November, 05:59
    0
    For each load, Work = (mass) x (gravity) x (distance.

    Bigger load: Work = (10 kg) x (9.8 m/s²) x (2 m) = 196 joules.

    Smaller load: Work = (5 kg) x (9.8 m/s²) x (4 m) = 196 joules.

    The work required is equal in both cases.

    The mass ratio of 2:1 is exactly balanced by

    the height ratio of 1:2.
Know the Answer?
Not Sure About the Answer?
Find an answer to your question 👍 “Which requires more work, lifting a 10.0kg load a vertical distance of 2m or lifting a 5.0kg load a distance of 4m? ...” in 📗 Physics if the answers seem to be not correct or there’s no answer. Try a smart search to find answers to similar questions.
Search for Other Answers