Ask Question
8 April, 23:46

A 1300 kg elevator is lifted at a constant speed of 1.3 m/s through a height of 22 m. How much work is done (a) by the tension in the elevator cable and (b) by gravity?

+1
Answers (1)
  1. 9 April, 00:07
    0
    Wc = mgd = 280 kj

    Wg = mgd = - 280 kJ
Know the Answer?
Not Sure About the Answer?
Find an answer to your question 👍 “A 1300 kg elevator is lifted at a constant speed of 1.3 m/s through a height of 22 m. How much work is done (a) by the tension in the ...” in 📗 Physics if the answers seem to be not correct or there’s no answer. Try a smart search to find answers to similar questions.
Search for Other Answers