Ask Question
9 June, 19:35

A crane does 9,500 j of work to lift a crate straight up using a force of 125 n. how high does the crane lift the crate?

+2
Answers (1)
  1. 9 June, 19:58
    0
    Work is calculated by multiplying the amount of force exerted by the distance that the object was displaced. The equation is,

    Work = Force x displacement

    Therefore, displacement is the quotient when work is divided by force.

    displacement = 9500 J / 125 N

    = 76 m

    Therefore, the crane was lifted 76 meters above the ground.
Know the Answer?
Not Sure About the Answer?
Find an answer to your question 👍 “A crane does 9,500 j of work to lift a crate straight up using a force of 125 n. how high does the crane lift the crate? ...” in 📗 Physics if the answers seem to be not correct or there’s no answer. Try a smart search to find answers to similar questions.
Search for Other Answers