It costs you $10 to draw a sample size n=1 and measure the attribute of interest. you have a budget of $1,200

+3
Answers (1)
  1. 5 July, 01:03
    0
    a. Do you have sufficient funds to estimate the population mean for the attribute of interest with a 95% confidence interval 4 units width? Assume that sd = 12

    n = {[ (Zalpha/2) ^2]*[sd]^2} / se^2

    n = (1.96) ^2 * (12) ^2 / (2) ^2

    n = 138.297 rounded up to 139

    There is not enough funds for this one since you’ll need 139 pieces and it costs 10 a piece, you’ll need 1390.

    b. 90% confidence interval

    n = {[ (Zalpha/2) ^2]*[sd]^2} / se^2

    n = (1.645) ^2 * (12) ^2 / (2) ^2

    n=98

    There is enough funds since 98 pieces for 10 a piece is equal to 980.