Sign In
Ask Question
Guest
Engineering
23 January, 07:11
2. The metal to be welded is called the
+2
WhatsApp
Telegram
Twitter
Answers (
1
)
Haylee Velez
23 January, 07:16
0
I believe the answer is "filler metal"
Comment
Complaint
Link
Know the Answer?
Answer
Not Sure About the Answer?
Find an answer to your question 👍
“2. The metal to be welded is called the ...”
in 📗 Engineering if the answers seem to be not correct or there’s no answer. Try a smart search to find answers to similar questions.
Search for Other Answers
You Might be Interested in
How do you keep the weight evenly distributed on a trailered boat? A. Only store heavy items in the boat B. Tie down any loose items or equipment in the boat C. Avoid loading the boat with additional gear D. Avoid tying down the boat to the trailer
Answers (1)
Draw and label the [100], [110] and [111] directions in a cubic unit cell
Answers (1)
Show that J/kg and m^2/s^2 are the same.
Answers (1)
A classroom that normally contains 40 people is to be air-conditioned with window airconditioning units of 5-kW cooling capacity. A person at rest may be assumed to dissipate heat at a rate of about 360 kJ/h.
Answers (2)
For an Ac signal with peak voltage Vp equal to 60V, the same power would be delivered to a load with a dc voltage of
Answers (1)
New Questions in Engineering
2. How can manual SA welding gun movement be performed?
Answers (1)
The format_address function separates out parts of the address string into new strings: house_number and street_name, and returns: "house number X on street named Y".
Answers (1)
A hard real-time system has been developed to for a fly-by-wire aviation system. It has sensors for the following pilot interface systems: System Sampling Frequency (Hz) CPU time required (ms) Yoke 20 5 Rudder pedals 15 2 Throttle 10 1 Overhead of
Answers (1)
An insulated rigid tank of volume 8 m3 initially contains air at 600 kPa and 400 K. A valve connected to the tank is opened, and air escapes until the pressure inside the tank is 200 kPa.
Answers (1)
Eutectic product in Fe-C system is called A. Pearlite B. Bainite C. Ledeburite D. Spheroidite
Answers (1)
Home
»
Engineering
» 2. The metal to be welded is called the
Sign In
Ask Question
Menu
Calculator
Subjects
History
English
Mathematics
Biology
Physics
Chemistry
Geography
Social Studies
Business
Law
Arts
SAT
Advanced Placement (AP)
Computers & Technology
Engineering
Sign In
close
Sign In
Sign Up
Forgot Password?